Peter Cooper,   Assistant Director of Facilities for Utilities
MIT  Bldg NE20-277     617-258-8317  (fax 253-3737)  plcooper@mit.edu

> ----------
> From: 	Peter Cooper[SMTP:PLCooper@PLANT.MIT.EDU]
> Sent: 	Monday, December 27, 1999 5:44 PM
> To: 	'ao-query@mit.edu'
> Cc: 	RM-Coach; RM-Utl; RM-Coach; Jim Wallace; 'utilities@mit.edu';
> 'sirianni@mit.edu'
> Subject: 	12/22 Power Interruption
> 
> On Wednesday 12/22/99 at 2:55pm, buildings on the normal 2400 volt loops
> experienced an unexpected two minute loss of power.  The affected
> buildings
> were 1-17,  24,26,31,35,41,W4,W5,W7,W8,W15,W33,W51,W53.
> 
> The power interruption came at the end of two days (Mon. and Wed.) of
> testing of the new 2000kW emergency diesel generator, switchgear and
> controls in the Central Utility Plant.  We had transferred 2400v normal
> loads to the B bus on Monday morning to isolate them from disturbances
> related to emergency power testing.  The unexpected two minute gap
> occurred
> while transferring circuits back to the normal configuration.
> 
> We apologize for the disruptions this unexpected 2 minute interruption
> caused.  The testing was completed on 12/22 and we anticipate smooth
> running
> through the Y2K weekend.
> 
> Peter Cooper
> Peter Cooper,   Assistant Director of Facilities for Utilities
> MIT  Bldg NE20-277     617-258-8317  (fax 253-3737)  plcooper@mit.edu
> 