The following shutdown request for Bldgs. 7 and 5 (All Electric Power &
Lighting) on 8/5 is for your information and comment. Would you please
let me know if this meets with your approval or not.
Thanks very much.
Andrea Nichols
Operations Center
8-7872
> Status: Normal
> Building: Bldgs. 5 and 7
> Date: 8/5/98
> Day: Wednesday
> Time: 9:00 PM - 9:30 PM
> System: All electric power & lighting
> Duration: 1/2 hour
> Reason:
> To test high voltage cable
>
> Effect:
> Loss of Power: Access Controls, building power, elevators, computers,
> lighting; Water: chilled water (air conditioning), heating hot water;
> Air: supply ventilation, supply cooling, supply heating,
> exhaust-laboratory, exhaust-general, exhaust-toilet, compressed
> control, compressed lab air and lab vacuum air; Steam: condensate
> return.
>
>