[44340] in Hotline Meeting
RE:Requested Rescheduled Possible Date for Bldg. E52 Critical Shu
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Thu Jul 30 13:08:11 1998
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'shutdowns@mit.edu'" <shutdowns@MIT.EDU>,
"'lhill@mit.edu'"
<lhill@MIT.EDU>,
"'hmadnic@mit.edu'" <hmadnic@MIT.EDU>, "'gwj@mit.edu'"
<gwj@MIT.EDU>,
"'maureen@mit.edu'" <maureen@MIT.EDU>,
"'jbkalb@mit.edu'"
<jbkalb@MIT.EDU>, "'mwf@mit.edu'" <mwf@MIT.EDU>
Cc: Shutdown <Shutdown@PLANT.MIT.EDU>
Date: Thu, 30 Jul 1998 13:02:42 -0400
Dear Everyone:
The next possible available date for this rescheduled Critical shutdown
if Sunday, 8/2. Would you please let me know if this date is all right
or not.
Thank you for your time. (This is all right with the Faculty Club and
the Schedules' Office.)
Andrea Nichols
Operations Center
8-7872
----------
> Status: Critical
> Building: E52 - Entire Building
> Date: 8/2/98
> Day: Sunday
> Time: 7:00 AM - 11:00 AM
> System: Air Handler 1 - No Cooling
> Duration: 4 hours
> Reason:
> Repair at chill water control valve
>
> Effect:
> Loss of chilled water (no cooling in building) during
shutdown.
>
>