Bldg. E19 (but will affect the air in E18 & E17 also) Shutdown R

daemon@ATHENA.MIT.EDU (Andrea Nichols)
Tue May 5 11:01:10 1998

From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'aufiero@mit.edu'" <aufiero@MIT.EDU>,
        "'jean@crc.mit.edu'"
	 <jean@crc.mit.edu>,
        "'rmelo@mit.edu'" <rmelo@MIT.EDU>,
        "'shyoung@mit.edu'" <shyoung@MIT.EDU>,
        "'jmganno@mit.edu'"
	 <jmganno@MIT.EDU>,
        Dan Crovo <DCrovo@PLANT.MIT.EDU>,
        "'mparker@mit.edu'"
	 <mparker@MIT.EDU>,
        "'bethannt@mit.edu'" <bethannt@MIT.EDU>,
        "'goodluck@mit.edu'" <goodluck@MIT.EDU>,
        "'opsnote@mit.edu'"
	 <opsnote@MIT.EDU>,
        "'jfarrell@mit.edu'" <jfarrell@MIT.EDU>,
        "'wbarrett@mit.edu'" <wbarrett@MIT.EDU>,
        "'esicco@mit.edu'"
	 <esicco@MIT.EDU>,
        "'dlambert@mitvma.mit.edu'" <dlambert@mitvma.mit.edu>,
        "'cashaw@mit.edu'" <cashaw@MIT.EDU>,
        "'edie@mitfmc.mit.edu'"
	 <edie@mitfmc.mit.edu>,
        "'dlfair@mit.edu'" <dlfair@MIT.EDU>,
        "'honiker@mit.edu'" <honiker@MIT.EDU>,
        "'kelley@mit.edu'"
	 <kelley@MIT.EDU>,
        "'schedule@mit.edu'" <schedule@MIT.EDU>,
        "'shutdowns@mit.edu'" <shutdowns@MIT.EDU>,
        "'pritch@mit.edu'"
	 <pritch@MIT.EDU>,
        "'cbunker@mit.edu'" <cbunker@MIT.EDU>,
        "'wardd@mit.edu'" <wardd@MIT.EDU>
Cc: "'shutdown@plant.mit.edu'" <shutdown@plant.mit.edu>
Date: Tue, 5 May 1998 10:58:05 -0400

> To: 	aufiero@mit.edu; jean@crc.mit.edu; rmelo@mit.edu;
> shyoung@mit.edu; jmganno@mit.edu; Dan Crovo; mparker@mit.edu;
> bethannt@mit.edu; goodluck@mit.edu; opsnote@mit.edu; jfarrell@mit.edu;
> wbarrett@mit.edu; esicco@mit.edu; dlambert@mitvma.mit.edu;
> cashaw@mit.edu; edie@mitfmc.mit.edu; dlfair@mit.edu; honiker@mit.edu;
> kelley@mit.edu; schedule@mit.edu; shutdowns@mit.edu; pritch@mit.edu;
> cbunker@mit.edu; wardd@mit.edu
> Cc: 	shutdown@plant.mit.edu
> Subject: 	Bldg. E19  (but will affect the air in E18 & E17 also)
> Shutdown Request for 5/14-PM 5/15 AM
> 
> 
The following shutdown request for Bldg. E19 (but will also affect the
air in E18 and RO/de-ionized water in E17) on 5/14-15 is for your
information and comment. Woul you please let me know if this has your
approval or disapproval.

Note: This shutdown would affect the following floors and Air Handler
systems:  4th Floor mezzanine - Air Handler 4.1 - E19  4th and 5h
floors; Air Handler 4.2 - E18 4th Floor (CRC); 7th Floor Mezzanine - Air
Handler 7.1 - (E19 - 6th and 7th Floors; Air Handler 7.2 - E18 - 6th
Floor; Air Handler 7.3 - E18 6th floor; Heat for E18 4th and 6th floors
will be down as well as RO/de-ionized water for E17 and E18.

This will affect
Thank you.


> Status: Normal
> Building: E19 (but will affect Air for E18 also)
> Date: 5/15/98
> Day: Thursday
> Time: 5/15 PM - 5/16 AM
> System: All electric normal power & lighting. 
> Duration: 7 hours
> Reason: 
> To install metering equipment on main switchgear. - Note: Emergency
> power will be on. 6th Floor telephone room will have emergency power
> on.
> 
> Effect: 
> Loss of Power: access controls, bldg. poer, elevators, computers,
> lighting; Waer - chilled water (air conditioning); Air: supply
> ventilation, supply cooling, supply heating, exhaust laboratory air,
> exhaust general air, exhaust toilet air and compressed control air;
> Steam - condensate return only.
> 
> 