[42877] in Hotline Meeting
Bldg. 48 - Power & Lighting Shutdown Request for 4/23 and 4/24
daemon@ATHENA.MIT.EDU (Andrea Nichols)
Thu Apr 16 15:31:06 1998
From: Andrea Nichols <andrea@PLANT.MIT.EDU>
To: "'sfrankel@mit.edu'" <sfrankel@MIT.EDU>,
"'hfhemond@mit.edu'"
<hfhemond@MIT.EDU>,
"'mistetri@deslab.mit.edu'"
<mistetri@deslab.mit.edu>,
"'schedule@mit.edu'" <schedule@MIT.EDU>,
"'shutdowns@mit.edu'" <shutdowns@MIT.EDU>
Cc: "'shutdown@plant.mit.edu'" <shutdown@plant.mit.edu>,
Neil Tomlinson
<NTomlins@PLANT.MIT.EDU>
Date: Thu, 16 Apr 1998 15:28:42 -0400
> To: sfrankel@mit.edu; hfhemond@mit.edu; mistetri@deslab.mit.edu;
> schedule@mit.edu; shutdowns@mit.edu
> Cc: shutdown@plant.mit.edu; Neil Tomlinson
> Subject: Bldg. 48 - Power & Lighting Shutdown Request for 4/23
> and 4/24
>
>
The following Power and Lighting Shutdown Request for Bldg. 48 on 4/23
and 4/24 is for your information and comment. Would you please let me
know if this is all right or not.
Thank you.
Andrea Nichols
Operations Center
8-7872
> Status: Critical
> Building: 48
> Date: 4/23/24
> Day: Thursday
> Time: 8-8:30 PM/7AM - 7:00 AM
> System: All Power and Lighting
> Duration: 1/2 hr. each
> Reason:
> To replace electrical switch-gear. First shutdown, second one is in
> approx. 4-weeks. 4/23 Thursday - Shutdown is from 8:00 - 8:30 PM;
> Friday, 4/24 - Shutdown is from 7:00 AM - 7:30 AM
>
> Effect:
> Loss of Power: access controls, bldg. power, elevators, computers,
> telephones, lighting, corridors/stairs. Air: Supply ventilation,
> supply cooling, supply heating, exhaust laboratory, exhaust general
> exhaust toilet, compessed control, compressed lab air and lab vacuum
> air. - Entire building will be supplied from generator (Thursday,
> 4/23). Friday shutdown Building will be on normal power at 7:31 AM on
> Friday, 4/24.
>
>