[38217] in Hotline Meeting
Requested Shutdown - Bldg. 26 - 5/17
daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Wed May 7 09:04:02 1997
Date: Wed, 7 May 1997 09:02 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: shutdowns@MIT.EDU, schedule@MIT.EDU, radams@mitlns.mit.edu,
gfp170@mitrlevm.mit.edu, blair@MIT.EDU, b-zone@MIT.EDU
X-Envelope-To: b-zone@mit.edu, blair@mit.edu, schedule@mit.edu,
shutdowns@mit.edu
X-Vms-To:
IN%"shutdowns@mit.edu, schedule@mit.edu, radams@mitlns.mit.edu, gfp170@mitrlevm
.mit.edu, blair@mit.edu, b-zone@mit.edu"
The following requested shutdown for Bldg. 26 on 5/17 is for your
information and comment. Would you please let me know if this has your
approval or not.
Thanks.
Andrea Nichols
Operations Center
8-7872
Building: 26
System: Normal electrical power
Date: 5/17
Day: Saturday
Time: 7:00 AM - 5:00 PM
Duration: 10 hours
Reason: Upgrade high voltage switch
Effect: Loss of Power: access controls, building power,
elevators, computers, telephones and lighting;
Water: chilled water;
Air: supply ventilation, supply cooling, supply
heating, laboratory exhaust air, general exhaust
air, toilet exhaust air, compressed control air,
compressed lab air and lab vaccum air;
steam: condensate return.