Requested Shutdown - Bldg. 26 - 5/17

daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Wed May 7 09:04:02 1997

Date: Wed, 7 May 1997 09:02 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: shutdowns@MIT.EDU, schedule@MIT.EDU, radams@mitlns.mit.edu,
        gfp170@mitrlevm.mit.edu, blair@MIT.EDU, b-zone@MIT.EDU
X-Envelope-To: b-zone@mit.edu, blair@mit.edu, schedule@mit.edu,
 shutdowns@mit.edu
X-Vms-To: 
 IN%"shutdowns@mit.edu, schedule@mit.edu, radams@mitlns.mit.edu, gfp170@mitrlevm
   .mit.edu, blair@mit.edu, b-zone@mit.edu"

The following requested shutdown for Bldg. 26 on 5/17 is for your
information and comment. Would you please let me know if this has your
approval or not.

Thanks.

Andrea Nichols
Operations Center
8-7872

Building:       26
System:         Normal electrical power
Date:           5/17
Day:            Saturday
Time:           7:00 AM - 5:00 PM
Duration:       10 hours
Reason:         Upgrade high voltage switch
Effect:         Loss of Power: access controls, building power,
                elevators, computers, telephones and lighting;
                Water: chilled water;
                Air: supply ventilation, supply cooling, supply
                heating, laboratory exhaust air, general exhaust
                air, toilet exhaust air, compressed control air,
                compressed lab air and lab vaccum air;
                steam: condensate return.