The following requested shutdown for Bldg. 26-100 for 11/22 is for your
information and comment. Would you please let me know if this has your
approval or disapproval.
Thanks very much.
Andrea Nichols
Operations Center
8-7872
Building: 26-100
System: Air Handler 1 System, Chilled Water Coil, Fan
Date: 11/22/96
Day: Friday
Time: 7:00 AM - 1:00 PM
Duration: 6 hours
Reason: Repair AH1 cooling coil drainage system (PM#701600
located in 26-004)
Effect: Loss of chilled water, supply ventilation, cooling
and heating during shutdown period.
Note: If the temperature is particularly cold outside
this work would be rescheduled. It is also supposed
to be much warmer next week (according to Bruce!).