Requested Shutdowns

daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Wed May 22 14:51:29 1996

Date: Wed, 22 May 1996 14:49 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: shutdowns@MIT.EDU
X-Envelope-To: shutdowns@mit.edu
X-Vms-To: IN%"shutdowns@mit.edu"

The following requested shutdowns are for your information and review.
Would you please advise if these are acceptable or unacceptable at your
earliest convenience.

Thanks.
Andrea
operation center
8-6651
or return email

5/22

Building:       7 - 4th floor
System:         Sprinkler System
Date:           5/28/96
Day:            Tuesday
Time:           7:00 AM - 3:00 PM
Duration:       8 hours
Reason:         Tie-in new system on the 4th floor.
Effect:         Loss of fire protect water -there is backup system
                however.

Building:       W16
System:         Chill Water for Cooling
Date:           5/30/96
Day:            Thursday
Time:           7:00 AM - 11:00 PM
Duration:       16 hours
Reason:         Have to tie in new chill water pumps.
Effect:         Loss of chilled water

Building:       E32 entire building
System:         Chill Water System
Date:           5/24/96
Day:            Friday
Time:           7:00 AM - 3:00 PM
Duration:       8 hours or less
Reason:         To tie in new chill water pipes to East Campus Chill
                Water Plant (and eliminate roof tower).
Effect:         No cooling in entire building.