[33060] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Proposed Shutdown - Bldg. 7 and 3

daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Thu Apr 18 14:53:52 1996

Date: Thu, 18 Apr 1996 13:27 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: shutdowns@MIT.EDU, opsnote@MIT.EDU, mmahoney@MIT.EDU, cust-coach@MIT.EDU,
        fenner@MIT.EDU
X-Envelope-To: cust-coach@mit.edu, fenner@mit.edu, mmahoney@mit.edu,
 opsnote@mit.edu, shutdowns@mit.edu
X-Vms-To: 
 IN%"shutdowns@mit.edu, opsnote@mit.edu, mmahoney@mit.edu, cust-coach@mit.edu, f
   enner@mit.edu"

The following information pertains to the proposed shutdown of
Buildings 7 and 3. Would you please advise me either via return e-mail
or call me at 8-6651 if this is acceptable.

Thanks.
Andrea

Building:       7 and 3
System:         Low pressure steam and chilled water.
Date:           4/22/96
Day:            Monday
Time:           7:00 AM - 3:00 PM
Duration:       8 hours
Reason:         To cut and cap existing lines for construction. 7-401
                and 7-403 will lose chilled water permanently.
Effect:         Concerning Bldg. 7 and steam shutdown--this will have
                no impact on occupied areas. There will be no air
                conditioning for Building 7A, and 7-111. There will be
                no impact on Building 3 for the steam and chilled water
                shutdown.


home help back first fref pref prev next nref lref last post