[33060] in Hotline Meeting
Proposed Shutdown - Bldg. 7 and 3
daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Thu Apr 18 14:53:52 1996
Date: Thu, 18 Apr 1996 13:27 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: shutdowns@MIT.EDU, opsnote@MIT.EDU, mmahoney@MIT.EDU, cust-coach@MIT.EDU,
fenner@MIT.EDU
X-Envelope-To: cust-coach@mit.edu, fenner@mit.edu, mmahoney@mit.edu,
opsnote@mit.edu, shutdowns@mit.edu
X-Vms-To:
IN%"shutdowns@mit.edu, opsnote@mit.edu, mmahoney@mit.edu, cust-coach@mit.edu, f
enner@mit.edu"
The following information pertains to the proposed shutdown of
Buildings 7 and 3. Would you please advise me either via return e-mail
or call me at 8-6651 if this is acceptable.
Thanks.
Andrea
Building: 7 and 3
System: Low pressure steam and chilled water.
Date: 4/22/96
Day: Monday
Time: 7:00 AM - 3:00 PM
Duration: 8 hours
Reason: To cut and cap existing lines for construction. 7-401
and 7-403 will lose chilled water permanently.
Effect: Concerning Bldg. 7 and steam shutdown--this will have
no impact on occupied areas. There will be no air
conditioning for Building 7A, and 7-111. There will be
no impact on Building 3 for the steam and chilled water
shutdown.