[33055] in Hotline Meeting
Request for Shutdown - Bldg. 13-502
daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Thu Apr 18 09:25:57 1996
Date: Thu, 18 Apr 1996 09:24 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: shutdowns@MIT.EDU, opsnote@MIT.EDU, susang@MIT.EDU
X-Envelope-To: opsnote@mit.edu, shutdowns@mit.edu, susang@mit.edu
X-Vms-To: IN%"shutdowns@mit.edu, opsnote@mit.edu, susang@mit.edu"
Shown below is information pertaining to the requested shutdown for
Bldg. 13 - 5023 for your review. Please advise if this is acceptable
either via return e-mail or call me at 8-6651 at your earliest convenience.
Thanks and I look forward to hearing from you.
Andrea
Building: 13-5023 (Utility rm.)
System: Hood Fans and General Exhaust Fan
Date: 4/23/96
Time: 7:00 AM - 7:00 PM
Duration: 12 hours
Reason: Repairs to 480 volt disconnects.
Effect: Loss of exhaust-laboratory and exhaust-general air.