Rescheduled Shutdowns - W85 (Westgate) Highrise and lowrise bldgs.

daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Fri Apr 12 08:58:45 1996

Date: Fri, 12 Apr 1996 08:57 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: shutdowns@MIT.EDU, opsnote@MIT.EDU, cust-coach@MIT.EDU, mwhelan@MIT.EDU,
        Colins@MIT.EDU
X-Envelope-To: Colins@mit.edu, cust-coach@mit.edu, mwhelan@mit.edu,
 opsnote@mit.edu, shutdowns@mit.edu
X-Vms-To: 
 IN%"shutdowns@mit.edu, opsnote@mit.edu, cust-coach@mit.edu, mwhelan@mit.edu, Co
   lins@mit.edu"

The following information pertains to the requested rescheduled
shutdown for W85. The work was not performed this week due to the snow
storm. Pls. advise if you forsee a problem with this. I can be
contacted either via return e-mail or telephone at 8-6651.

Thanks and I look forward to hearing from you.
Andrea

Building:       W85 - all
System:         All NORMAL power
Date:           4/17/96
Day:            Wednesday
Time:           9:00 AM - 10:00 AM
Duration:       1 hour
Reason:         To tie in new electrical feeder cable.
Effect:         Loss of access controls, bldg. power, elevators,
                computers, lighting, hot domestic and heating hot water,
                supply-ventilation, supply heating, exhaust-general,
                exhaust toilet, compressed control air, steam, condensate
                return and heat for both high and low rise buildings.

Building:       W85-all
System:         All EMERGENCY power
Date:           4/17/96
Day:            Wednesday
Time:           Between 6:00 AM - 6:30 AM and 3:00 PM - 3:30 PM
Duration:       10 minutes maximum each time
Effect:         Loss of emergency power, elevators, and stair lighting
                in both high and low rise buildings.