The following pertains to the requested shutdown for Bldg. 68-08 and is
for your review and information. Please advise me, at your earliest
convenience, if this would be acceptable either by return e-mail or
phone me at 8-6651.
Thanks and I look forward to hearing from you.
Andrea
Building: 66-408
System: Chilled Water
Date: 4/16/96
Day: Tuesday
Time: 7:30 AM - 1:30 PM
Duration: 6 hours
Reason: Have to tie in new unit. Lab chilled water pump in 66-6th
floor mechanic rm. will have to be secured. High pressure
(l00PSI) lab air compressors are cooled by chilled water and
will have to be secured; no high pressure compressed
air to the building. Low pressure (40 PSI) service will not
be affected.
Effect: Loss of chilled water for air conditioning and pressure
cooling for entire building.