[32855] in Hotline Meeting
Requested Shutdown for E25 -- 4/10/96
daemon@ATHENA.MIT.EDU (OPCTEMP2%MITPPL.bitnet@mitvma.mit.)
Thu Apr 4 16:02:50 1996
Date: Thu, 4 Apr 1996 16:01 EDT
From: OPCTEMP2%MITPPL.bitnet@mitvma.mit.edu
To: shutdowns@MIT.EDU, e-zone@MIT.EDU, bengel@MIT.EDU, scotts@MIT.EDU
X-Envelope-To: bengel@mit.edu, e-zone@mit.edu, scotts@mit.edu, shutdowns@mit.edu
X-Vms-To: IN%"shutdowns@mit.edu, e-zone@mit.edu, bengel@mit.edu, scotts@mit.edu"
The following is a requested shutdown for Bldg. E25. Based on the
information below, would you please advise if this is acceptable either
by return email or phone me at 8-6651.
Thank you and I look forward to hearing from you.
Andrea
Building: E25-006
System: Air Handler 1, Supply Fan 1. Supply to Northeast Labs -
floors 2-6 as follows: Rooms 006, 214, 218, 222, 222A&B
226, 226A, 310, 310 A&B, 318, 326C, 414A, 414, 418A,
422, 426, 426A, 610, 612, 614, 616A, 626A, 630A, 632
Date: 4/10/96
Day: Wednesday
Time: 3:00 PM - 11:00 AM
Duration: 8 hours
Reason: To inspect and repair chilled water coil (for air
conditioning).
Effect: Loss of supply-ventilation and supply-heating.