Shutdowns

daemon@ATHENA.MIT.EDU (JOHN NARCOTTA)
Fri Mar 1 15:25:43 1996

Date: Fri, 1 Mar 1996 15:24 EDT
From: JOHN NARCOTTA <OPCTEMP%MITPPL.bitnet@mitvma.mit.edu>
To: shutdowns@MIT.EDU, Dcarlson@MIT.EDU, Cappucci@MIT.EDU, Opsnote@MIT.EDU,
        Me-all@MIT.EDU, Sdverify@MIT.EDU
X-Envelope-To: Cappucci@mit.edu, Dcarlson@mit.edu, Me-all@mit.edu,
 Opsnote@mit.edu, Sdverify@mit.edu, shutdowns@mit.edu
X-Vms-To: 
 IN%"shutdowns@mit.edu, Dcarlson@mit.edu, Cappucci@mit.edu, Opsnote@mit.edu, Me-
   all@mit.edu, Sdverify@mit.edu"

The following shutdowns are for your information:

Critical
Building:       7 (4th floor)
System:         Steam - there will be no heat for entire building
Date:           3/4/96
Day:            Monday
Time:           6:00 AM - 8:30 AM
Duration:       2 1/2 hours
Reason:         Asbestos Removal from pipe area on 4th floor.
Effect:         Loss of heat for entire building. However, heat will
                automatically turn on at 8:30 AM.

Critical
Building:       26-152 (Physics Reading Room)
System:         Air Handler 20 - supply air (perimeter heat not
                affected).
Date:           3/4 - 8/96
Day:            Monday - Friday
Time:           7:00 AM - 3:00 PM each day
Duration:       5 days
Reason:         To replace chill water coils in fan AH-20 for summer
                time cooling.
Effect:         Loss of supply ventilation, cooling and heating.
                Perimeter heat will not be affected.