[32341] in Hotline Meeting
Shutdowns
daemon@ATHENA.MIT.EDU (JOHN NARCOTTA)
Fri Mar 1 15:25:43 1996
Date: Fri, 1 Mar 1996 15:24 EDT
From: JOHN NARCOTTA <OPCTEMP%MITPPL.bitnet@mitvma.mit.edu>
To: shutdowns@MIT.EDU, Dcarlson@MIT.EDU, Cappucci@MIT.EDU, Opsnote@MIT.EDU,
Me-all@MIT.EDU, Sdverify@MIT.EDU
X-Envelope-To: Cappucci@mit.edu, Dcarlson@mit.edu, Me-all@mit.edu,
Opsnote@mit.edu, Sdverify@mit.edu, shutdowns@mit.edu
X-Vms-To:
IN%"shutdowns@mit.edu, Dcarlson@mit.edu, Cappucci@mit.edu, Opsnote@mit.edu, Me-
all@mit.edu, Sdverify@mit.edu"
The following shutdowns are for your information:
Critical
Building: 7 (4th floor)
System: Steam - there will be no heat for entire building
Date: 3/4/96
Day: Monday
Time: 6:00 AM - 8:30 AM
Duration: 2 1/2 hours
Reason: Asbestos Removal from pipe area on 4th floor.
Effect: Loss of heat for entire building. However, heat will
automatically turn on at 8:30 AM.
Critical
Building: 26-152 (Physics Reading Room)
System: Air Handler 20 - supply air (perimeter heat not
affected).
Date: 3/4 - 8/96
Day: Monday - Friday
Time: 7:00 AM - 3:00 PM each day
Duration: 5 days
Reason: To replace chill water coils in fan AH-20 for summer
time cooling.
Effect: Loss of supply ventilation, cooling and heating.
Perimeter heat will not be affected.