Shutdowns
daemon@ATHENA.MIT.EDU (JOHN NARCOTTA)
Tue Feb 20 15:47:04 1996
Date: Tue, 20 Feb 1996 15:46 EDT
From: JOHN NARCOTTA <OPCTEMP%MITPPL.bitnet@mitvma.mit.edu>
To: shutdowns@MIT.EDU, dcarlson@MIT.EDU, cappucci@MIT.EDU, susang@MIT.EDU,
sdverify@MIT.EDU
X-Envelope-To: cappucci@mit.edu, dcarlson@mit.edu, sdverify@mit.edu,
shutdowns@mit.edu, susang@mit.edu
X-Vms-To: IN%"shutdowns@mit.edu", IN%"dcarlson@mit.edu", IN%"cappucci@mit.edu",
IN%"susang@mit.edu", IN%"sdverify@mit.edu"
Enclosed is a listing of shutdowns that will take place beginning
tomorrow (Wed., 2/21 - Saturday, 2/24) for your information.
Building: 37 - whole building
System: Hot and cold processed and domestic water.
Date: 2/27/96
Day: Tuesday
Time: 8:00 AM - 3:00 PM
Duration: 7 Hours
Reason: Replace Gate Valves on the Mains
Effect: Loss of hot and cold water - restrooms will be out of
service. However adjacent buildings' restrooms
may be used (buildings 35 & 39).
Building: 13-5016 (Hoods #1-5)
System: PM#715148 and #715149 Fume Exhaust Hood Fans
Date: 3/13/96
Day: Wednesday
Time: 8:00 AM - 1:00 PM
Duration: 5 Hours
Reason: To change variable fan drive wiring
Effect: Loss of Fume Exhaust Hood Fans in Rm. 5016.
Building: W13 - Bexley Hall
System: Heating steam only.
Date: 2/22/96
Day: Thursday
Time: 9:00 AM - 12 Noon
Duration: 3 Hours
Reason: Install radiator in Rm. 301, replace radiator valve in
210 bathroom.
Effect: Loss of low pressure steam only.
Critical
Building: 66 - North Side (Air Handler 1 - Supply Fan IA and
Supply Fan 1B).
System: Ventilation, cooling and heating to Lab Supply system.
Date: 2/24/96
Day: Saturday
Time: 7:00 AM - 6 - 8 PM
Duration: 6 - 8 Hours
Reason: Allen Bradley rep and Tim Callahan to change caps on
speed drive.
Effect: Loss of supply-ventilation, cooling and heating.
Building: 39 - #708550 serves east offices and 5th floor labs.
System: Air Handler 4 (supply ventilation)
Date: 2/23/96
Day: Friday
Time: 9:30 AM - 11:30 AM
Duration: 2 Hours
Reason: Change filters
Effect: Loss of supply ventilation.
Building: 39 (#708551 serves west offices and 5th floor labs).
System: Air Handler 3 (supply ventilation)
Date: 2/23/96
Day: Friday
Time: 12 Noon - 2:00 PM
Duration: 2 hours
Reason: To change filters
Effect: Loss of supply ventilation.
Building: 39 (#708553 serves 301 East).
System: Air Handler 1 (supply ventilation)
Date: 2/24/96
Day: Saturday
Time: 7:30 AM - 10:00 AM
Duration: 2.5 hours
Reason: To change filters and clean rooms.
Effect: Loss of supply ventilation.
Building: 39 (#708552 serves 301 West.)
System: Air Handler 2
Date: 2/24/96
Day: Saturday
Time: 10:00 AM - 12:30 PM
Duration: 2.5 Hours
Reason: To change filters and clean rooms.
Effect: Loss of supply ventilation.