[32012] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Shutdowns for 2/15 and 2/16/96

daemon@ATHENA.MIT.EDU (JOHN NARCOTTA)
Fri Feb 9 14:47:13 1996

Date: Fri, 9 Feb 1996 14:47 EDT
From: JOHN NARCOTTA <OPCTEMP%MITPPL.bitnet@mitvma.mit.edu>
To: dcarlson@MIT.EDU, cappucci@MIT.EDU, shutdowns@MIT.EDU
X-Envelope-To: cappucci@mit.edu, dcarlson@mit.edu, shutdowns@mit.edu
X-Vms-To: IN%"dcarlson@mit.edu", IN%"cappucci@mit.edu",IN%"shutdowns@mit.edu"

The following shutdowns will take place next week:
Building:       E51
System:         Building power and lighting (emergency power will be
                on)
Date:           2/16/96
Day:            Friday
Time:           3 a.m. - 7 a.m.
Duration:       4 hours
Reason:         To tie new feeder into switchgear
Effect:         Loss of building power, power to computers and
                lighting, air supply and exhaust systems,heating
                and cooling systems,and steam condensate return systems
                for the duration of the shutdown.

Building:       E25
System:         No potable hot storage tanks
Date:           2/15/96
Day:            Thursday
Time:           4:00 PM - Midnight
Duration:       8 hours
Reason:         Replace defective piping and valves and circulator
                piping to storage tanks
Effect:         No non-potable water to Buildings E23 - E25 (includes
                cage washers in animal quarters.

Building:       E51 - all
System:         All lighting and power (emergency power will be on).
Date:           2/16/96
Day:            Friday
Time:           3:00 AM - 7:00 AM
Duration:       4  hours
Reason:         To tie new feeder into switchgear.
Effect:         Loss of  heat and cooling. All lighting and power
                (emergency [power will be on.)

home help back first fref pref prev next nref lref last post