[31859] in Hotline Meeting

home help back first fref pref prev next nref lref last post

Re: Pickled-Herring

daemon@ATHENA.MIT.EDU (Louis A. Isgur)
Wed Jan 31 22:44:40 1996

To: hotline@MIT.EDU
Date: Wed, 31 Jan 1996 22:44:37 EST
From: "Louis A. Isgur" <larugsi@MIT.EDU>


------- Forwarded Message

Received: from SOUTH-STATION-ANNEX.MIT.EDU by po9.MIT.EDU (5.61/4.7) id AA16788; Wed, 31 Jan 96 22:43:58 EST
Received: from KILLER.MIT.EDU by MIT.EDU with SMTP
	id AA17821; Wed, 31 Jan 96 22:43:40 EST
Received: by killer.MIT.EDU (5.0/4.7) id AA00547; Wed, 31 Jan 1996 22:43:56 -0500
Message-Id: <9602010343.AA00547@killer.MIT.EDU>
To: bmurphy@MIT.EDU
Cc: dcns-cluster@MIT.EDU, sipb-staff@MIT.EDU
Subject: Re: Frank Estabrook Caper:
Date: Wed, 31 Jan 1996 22:43:56 EST
From: "Louis A. Isgur" <larugsi@MIT.EDU>
Content-Length: 2206

Hi Brian,
        Here is the skinny!

        1. I have fixed the 320 oliver. I have removed one 3 amp fuse from the 
           planar bd, from the system that Mike Barker gave us. This system is
           currently in the staging room under the 220 key box.
        2. I believe that I have also fixed the 220 Pickled-Herring.
           This system was troubleshooted down to a faulty mouse, which has 
           shorted out every Planar bd installed by Decision 1. I have replaced
           the mouse, and have given you the homicidal mouse as exhibit 'A'.
           Next I have replaced a 1.6 amp fuse on the planar bd. in 
           Pickled-Herring. It was now unable to see the hard drive. I then
           have removed the entire planar bd from the 220 M37-312-11,, and have
           swapped it out with Pickled-Herring. The system is now installing
           software. I have asked Karl Ram to page me if and when it comes up.
           I am confident that the system is now fixed, but not 100% sure.
        3. I have placed a call to Decision 1 requesting that Frank call you
           in the a.m. on Thursday. I was asked for a time for the call. I 
           gave 9:00a.m.
        
           In conclusion: This is where we stand hardware wise at this point
                          in time.

         A). Mike Barker's 320 CPU is in the staging room, and will require 
             one 3 amp fuse installed on the planar bd.
         B). The M37-312-11 cpu is currently in the staging room as well,, and
             will require a planar bd. If fuses are optional, which I doubt,
             it will require one 1.6 amp fuse.
             The M37-312 monitor is located in the 37 machine room. I have the
             security rods to the cpu, which are in the anchor pad, but do not
             have the 2 lock cylinders. Joe, do you have the cylinders??
         C). If and when Desicion 1 makes the repair on M37-312-11 in the 
             staging room, a CSR should go with Frank to 37-312 and fire the 
             system up. This should complete this hardware caper.
                  
                              Thanks,
                                    --Lou

------- End of Forwarded Message


home help back first fref pref prev next nref lref last post