The island testing of our gas turbine generator  began at 12:30am this 
morning ( Wed 22 ). Before the testing began, we started up our emergency 
diesel generator at the plant and picked up the emergency power loop so 
that there would have been  no disturbances to life safety power should 
problems have occurred. 

Our gas turbine generator easily maintained power to the campus load when 
we opened our ties to Cambridge Electric. We also performed this "island 
testing" when we were exporting power to Celco. The generator instantly 
decreased power output, and maintained power to our campus load. Lastly, we 
tested our load shed scheme and proved its successful operation. However, 
one of the tests that Cambridge Electric performed did not work correctly. 
This particular test, a transfer trip test initiated from the Putman 
Station in North Cambridge failed. Celco will be troubleshooting their 
equipment along with our support until the problem is found and corrected. 
This troubleshooting should have no affect on MIT. Testing was completed 
shortly after 3am. 

We wish to thank the MIT community for the cooperation extended to us in 
performing these very necessary tests. Representatives from MIT information 
services, MIT LEES ( electrical engineering lab) , the Cambridge wiring 
inspectors, our equipment supplier ABB, Commonwealth Electric and Cambridge 
Electric participated in witnessing the testing which was performed by 
physical plant along with ABB and Celco. 
 
Thank you all again for your cooperation.


Bill Wohlfarth for Vicki Sirianni, Director of Physical Plant