| home | help | back | first | fref | pref | prev | next | nref | lref | last | post |
Date: Fri, 02 Apr 93 15:37:22 From: has@MIT.EDU (Hasan Sharif) To: hotline@Athena.MIT.EDU Dave called in log# B39483. He worked with Steve Ellis on the Reynolds system. They reseated the memory syms and the darter boards and then tested the system for about an hour. All tests were error free and everything is set.
| home | help | back | first | fref | pref | prev | next | nref | lref | last | post |