| home | help | back | first | fref | pref | prev | next | nref | lref | last | post |
Date: Mon, 21 Dec 92 12:51:44 From: tmac@MIT.EDU (Teresa MacRae) To: shutdowns@MIT.EDU, net-help@MIT.EDU There is asbestos removal taking place in Building 10 on the 5th floor (outside the Library). There will be no ventilationin the Library.
| home | help | back | first | fref | pref | prev | next | nref | lref | last | post |