> Date: Fri, 11 Dec 92 15:27:49 EST
> From: tytso@Athena.MIT.EDU (Theodore Ts'o)
> To: network@Athena.MIT.EDU
> Cc: shutdowns@Athena.MIT.EDU
> Subject: Electrical shutdowns
> Address: 1 Amherst St., Cambridge, MA 02139
> Phone: (617) 253-8091
>
> December 29th.
> 7am to 7:10am. Buildings 8, 12, 24. 10 minute outage to switch
> feeders back to the "normal" ones. I haven't OK'ed this one
> yet; ten minutes should be within the limit of the UPS, but we
> might want to have someone there just in case, or we might want
> to arrange an alternative source of power for the 24 cisco.
> I told PP we'd get back to them on this one by Monday or
> Tuesday.
>
I spoke with Neil Tomlinson at the electrical shop. He is aware of the
10 minutes limit on our building 24 UPS and is confident that he can
complete the work within the required time limit.
-Jeff