electrical shutdowns -- Cleared these

daemon@ATHENA.MIT.EDU (Jerry Burke)
Fri Dec 11 09:18:20 1992

Date: Fri, 11 Dec 92 09:22:13 EST
From: burke@MIT.EDU (Jerry Burke)
To: shutdowns@MIT.EDU



Craig called from Physical

Dec 29 from 7am to 7:10am  Electrical Power and lighting shutdown in 
Bldg. 8, 12 and 24 lab only.
Reason normal feed repaired, switching back to normal feed.

DEC 29, Bldg. 31 West and 43 from  7:30 to 7:40 ,   208 and 120volt 
affected 

Dec 29, Bldg. 33, 35 31 and 41a  from 7:30 to 7:40 entire building 
shutdown all power and lighting.

Dec. 14,   Bldg 39 from 11pm to 7am -- recycling fans. 


Dec 15,   Bldg W91 from 8:30 to 9am  Dave  Lambert is aware.....