Power outages for Saturday Dec. 5th] -- CORRECTION

daemon@ATHENA.MIT.EDU (Jerry Burke)
Tue Dec 1 12:22:14 1992

Date: Tue, 01 Dec 92 12:25:43 EST
From: burke@MIT.EDU (Jerry Burke)
To: shutdowns@MIT.EDU

I only cleared #2 and #3      Jerry

#1 --   I did not clear, sorry for confusion --    Jerry

------- Forwarded Message

From: chris@MIT.EDU
Date: Tue, 1 Dec 92 08:43:25 EST
To: shutdowns@MIT.EDU
Subject: Power outages for Saturday Dec. 5th
Cc: network@MIT.EDU

PhysPlant called with these Tuesday at 8:20.  

1. Power in buildings 26,20,31,4,2, and 70 to be shut down from 8am-6pm.
        I did not okay this one.  We may want to push back with this
        short a notice.

2. Power in buildings 33,35,31(west),41,41A,43 to be shut down from
        7:30-7:40 am.  I okay'ed this for the network group.

3. Power in buildings 8,12, and 24.  I okay'ed this one as well for the
        network group.  The UPS in 24 should hold the network up for
        the duration of the outage.

  

------- End of Forwarded Message