[30] in DCNS Development
Re: DCNS-SysDev Meeting -- Action Items
daemon@ATHENA.MIT.EDU (Richard Basch)
Mon Jun 3 16:37:36 1991
Date: Mon, 3 Jun 91 16:34:28 -0400
To: Tom Coppeto <tom@MIT.EDU>
Cc: roden@MIT.EDU, developers@MIT.EDU
In-Reply-To: Tom Coppeto's message of Fri, 17 May 91 11:44:34 EDT,
From: Richard Basch <basch@MIT.EDU>
Date: Fri, 17 May 91 11:44:34 EDT
From: Tom Coppeto <tom@MIT.EDU>
* The document explaining the Imake setup should be done by June 1st,
authored by the group.
Can I have more info on this? Is this referring to the athena sources?
Is the group release engineering? Is there a rough draft around?
- Tom
A DRAFT form can be found in:
/source/control/doc/code-requirements
A lot of the re-structuring is based on the ports that we have been doing.
-Richard