[3737] in Release_7.7_team

home help back first fref pref prev next nref lref last post

Re: 11 February 2003 Athena UNIX Platform Team Monthly Status

daemon@ATHENA.MIT.EDU (Robert Ferrara)
Tue Feb 11 20:13:40 2003

Message-Id: <5.1.0.14.2.20030211201231.02f8d128@po9.mit.edu>
Date: Tue, 11 Feb 2003 20:13:18 -0500
To: Greg Hudson <ghudson@mit.edu>
From: Robert Ferrara <rferrara@MIT.EDU>
Cc: release-team@mit.edu
In-Reply-To: <200302112113.QAA23013@error-messages.mit.edu>
Mime-Version: 1.0
Content-Type: text/plain; charset="us-ascii"

Hi Greg, 

Thank you for picking this up in Bill's absence. 

Cheers, Bob 

At 04:13 PM 2/11/2003 -0500, Greg Hudson wrote:
>Team Name: Athena UNIX Platform Team
>    Team Leader: Bill Cattey
>  Report Date: 11 February 2003
>
>Submitted by: Greg Hudson
>
>    Team URL:      http://web.mit.edu/teamhtml/Athena/
>    Release URL:   http://web.mit.edu/release/www/
>
>Accomplishments past period:
>
>Last Month's goals:
>
>ONGOING: Further testing and bug fixing of Athena 9.1.
>
>PROGRESS: Work on Athena Solaris RPM stuff.
>PROGRESS: Complete integration of GNOME 2 and Evolution upgrades.
>
>DONE: Updated email documentation with Mozilla mail configuration.
>DONE: Evaluate disconnected operation deployment and identify what still
>      needs to be done.
>DONE: Deploy IAP patch release with local lockers framework, disconnected
>      operation framework, OpenAFS upgrade, Solaris security and kernel
>      fixes, and Evolution startup fix.
>DONE: Produce document, "Differences between Athena Linux and stock Red 
>      Hat Linux".
>DONE: Put Mozilla 1.2.1 for Solaris, and Linux with MIT configuration
>      into the infoagents locker for testing.  Add SGI version.
>DONE: Codify X server understandings into plans for Athena release,
>      announced level of laptop functionality, and recommendations
>      to IBM.
>
>Community Milestones Met:
>
>DONE: Testing of Mozilla 1.2.1, and setting it as default.
>DONE: Deploy IAP patch release.
>
>Other Accomplishments:
>
> * Integrated new versions of bash, OpenSSL, perl, gcc, and OpenSSH
>   for the next full release.
>
>Next month's goals:
>
>ONGOING: Further testing and bug fixing of Athena 9.1.
>
>OLD: Work on Athena Solaris RPM stuff.
>OLD: Complete integration of GNOME 2 and Evolution upgrades.
>
>NEW: Develop fast DNS timeout for disconnected operation.
>NEW: Develop friendly way to go on/off net or switch interfaces.
>NEW: Develop Disconnected Athena documentation.
>NEW: Investigate workaround for VMWare problem (see "Issues").
>NEW: Integrate new version of Pine for next full release.
>NEW: Integrate new version of openssh for next full release.
>NEW: Make installs of SMP Linux machines work properly.
>NEW: Develop IMAP-based "from" command to improve new message count at
>     login.
>NEW: Integrate Mozilla into Athena source tree.
>
>Next Community Milestone(s):
>
>Update Linux installer to support multi-processor machines.
>
>Issues:
>
>VMWare does not get along with the latest Red Hat Linux kernels.
>Although we don't support VMWare, some of our customers use it.  We
>advised users to delay taking the latest patch release if they use
>VMWare.  We recently learned of a possible workaround and are
>investigating it.
>
>The process of building Athena for Solaris now takes 21 hours on the
>current build machine, due to the high volume of GNOME 2 source and a
>newer, slower (but otherwise improved) gcc.  Long build times slow
>down integration work.
>
>We don't seem to have thought through the process of creating a local
>home directory for machines running disconnected.  This will make it
>difficult to write documentation.
>
>Summary: About the same as last month.
>
>Additional comments:
>
>Athena Monthly machine counts:
>
>(I don't have these, sorry.) 


home help back first fref pref prev next nref lref last post