[2081] in Release_7.7_team

home help back first fref pref prev next nref lref last post

Update: We are still GO for Monday deploy.

daemon@ATHENA.MIT.EDU (Bill Cattey)
Thu Feb 3 15:26:17 2000

Message-ID: <4saSFPgGgE6e0ReqA0@mit.edu>
Date: Thu,  3 Feb 2000 15:26:03 -0500 (EST)
From: Bill Cattey <wdc@MIT.EDU>
To: cluster-services@MIT.EDU
CC: owls@MIT.EDU, release-team@MIT.EDU

I just wanted to drop a quick note to reconfirm that we 
will have install floppies and instructions ready by Monday for
the deployment of the 10 pilot Linux Athena PCs.

At the release team Heather-Anne Harrison signed up to do
the appropriate one page sheet to put with each system to describe
how it is DIFFERENT.  This too will be ready by Monday.

Brian:

Are there any other things your team needs from us that is an obstacle
to deployment on or very soon after next Monday?

In a related story:

The Linux Athena test cluster machine should be installed to replace
the Sparc Classic dig-dug.  dig-dug can be decomissioned since
we're now completely out of the Classic business.

-wdc

home help back first fref pref prev next nref lref last post