[1047] in Release_7.7_team
sgi 8.1 release postponed
daemon@ATHENA.MIT.EDU (Jonathon Weiss)
Tue Jul 22 00:22:40 1997
From: Jonathon Weiss <jweiss@MIT.EDU>
To: release-team@MIT.EDU
Cc: ops@MIT.EDU
Date: Tue, 22 Jul 1997 00:22:29 EDT
so after synctreeing and releasing the 8.1 sgi inst volume into the
athena cell, I decided to do a quick sanity check on the sizes of the
volumes. It failed:
system.sgi_53.inst 536871825 RW 549078 K On-line
EZRA.MIT.EDU /vicepg
system.sgi_53.inst 537105189 RW 538938 K On-line
NYX.MIT.EDU /vicepa
Greg and I agreed that the right solution was to punt the sgi release
for tonight, but to let the sun one go out. I made the necessary
changes in moira. See you tomorrow.
Jonathon